QUESTION 1
The first step in material planning is (Choose the correct answer)

A.    CO/PA
B.    SOP
C.    MRP
D.    BOM

Answer: A

QUESTION 2
Time periods in the standard planning table could be (Choose all that apply)

A.    Minutes
B.    Days
C.    Weeks
D.    Accounting periods
E.    Sales periods

Answer: BCDE

QUESTION 3
In material planning, sales orders consume independent requirements. The consumption mode and consumption periods can be set in which of the following? (Choose all that apply)

A.    Vendor master
B.    Material master
C.    Product group
D.    MRP group

Answer: BD

QUESTION 4
Consumption based planning can be done on the following levels (Choose all that apply)

A.    Reorder-point planning
B.    Based on independent requirements
C.    Forecast-based planning
D.    Time-phased planning

Answer: ACD

QUESTION 5
MRP Control Parameters includes (Choose all that apply)

A.    Processing keys
B.    Create Purchase Requisitions
C.    Schedule lines
D.    Create MRP list
E.    Planning mode

Answer: ABCDE

QUESTION 6
The Document Management System allows for the integration of external files through which of the following? (Choose the correct answer)

A.    MDM
B.    SAP XI
C.    PLM interface
D.    Web AS
E.    CAx

Answer: C

QUESTION 7
Document Info Records allow documents to be linked to which of the following objects? (Choose all that apply)

A.    BOM s
B.    Material Master
C.    Production Orders
D.    PRTs
E.    QM Info records

Answer: ABCDE

QUESTION 8
To view original document in the Product Structure Browser, you use which of the following? (Choose the correct answer)

A.    Enterprise Application Integration (EAI) Viewer
B.    SAP list viewer
C.    ALV Grid Control
D.    Document Info Record

Answer: A

QUESTION 9
In Engineering Change Management, the Change Number structure includes which if the following? (Choose all that apply)

A.    Header
B.    Item
C.    Object change records
D.    Object types

Answer: ACD

QUESTION 10
The Kanban production type does not run with MRP. (True/False)

A.    True
B.    False

Answer: A

QUESTION 11
Master data for manufacturing consist of which of the following? (Choose all that apply)

A.    BOM s
B.    PRT  s
C.    Vendor master
D.    Material Master
E.    WorkCanter

Answer: ABDE

QUESTION 12
BOM s ar e usedi n(Choose all that apply)

A.    Vendor master data
B.    MRP
C.    Product costing
D.    Procurement

Answer: BCD

QUESTION 13
Basic data for the WorkCanter master records are maintained on which level? (Choose the correct answer)

A.    Client
B.    Company Code
C.    Plant
D.    Storage Location

Answer: C

If you want to pass SAP C_TERP10_65 successfully, donot missing to read latest lead2pass SAP C_TERP10_65 exam questions.
If you can master all lead2pass questions you will able to pass 100% guaranteed.

http://www.lead2pass.com/C-TERP10-65.html

Lead2pass Testking Pass4sure Actualtests Others
$99.99 $124.99 $125.99 $189 $29.99-$49.99
Up-to-Dated
Real Questions
Error Correction
Printable PDF
Premium VCE
VCE Simulator
One Time Purchase
Instant Download
Unlimited Install
100% Pass Guarantee
100% Money Back